Sign In | Join Free | My enlightcorp.com
China Guangzhou Kinte Electric Industrial Co., LTD logo
Guangzhou Kinte Electric Industrial Co., LTD
Guangzhou Kinte Industrial Co., Ltd.
Verified Supplier

4 Years

Home > BIW Engineering >

Chery Kaifeng Plant 30JPH Capacity Improvement Project

Guangzhou Kinte Electric Industrial Co., LTD
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Chery Kaifeng Plant 30JPH Capacity Improvement Project

Place of Origin : China

Brand Name : CEI-Kinte

Certification : ISO9001/FEM/ISO14001/OHSAS 18001

Model Number : Customized

MOQ : Negotiable

Price : Negotiable

Packaging Details : Packed with plastic films and wrap with strips

Delivery Time : According to customer's requirement

Payment Terms : Negotiable

Supply Ability : Strong production capacity

R&D : Professional R&D Team

Workshop : Body Shop

Manufacturing : In-house

Equipment : Automation

Flexibility : High

Sub-assembly : Main line/Bodyside/Closures/Floor line etc.

Welding : Spot welding/MAG MIG/Stud welding etc.

Layout : CAD drawing

Contact Now

Chery Kaifeng Plant 30JPH Capacity Improvement Project

1. Project name:

Chery Kaifeng Plant 30JPH Capacity Improvement Project

2. Project time:

December 2019

3. Project location

Chery Kaifeng Plant

4. Project introduction:

Models: 5 models (X70/X90/X90 base model/X95/65EV)

Capacity: 30JPH

Beat: 108S

Robots: NACHI, EFORT and KUKA brands, quantity 99 units

Model switching form: side trihedral turntable, side wheel cover online flexible hemming, engine room cross slide table switching library system, main off-line rolling bed skid conveyor system, general assembly GEO gripper positioning system, robot automatic glue coating system

5. Core technology:

1. On-line flexible hemming of side trihedral turntable and side wheel cover

2. Switching warehouse system of engine room cross slide table, main off-line rolling bed skid conveying system

3. The total GEO gripper positioning system and robot automatic glue application system

As one of the four major processes in the automotive industry, the welding process is self-evident. It shoulders the important mission of forming the body and providing a supporting frame for the vehicle. In addition to ensuring the appearance and shape, it must also ensure that all parts of the final assembly The precision of the component installation point, so its process is far more complicated than the other three major processes. The planning and layout of the production line not only need to consider from the aspects of precision assurance, production efficiency, distribution logistics, and storage, but are also limited by the plant area and structure, Existing conditions such as painting corridors. There is no perfect layout plan, only the most suitable layout plan at present.

6. Logistics and warehousing planning

Logistics warehousing planning should be considered comprehensively in combination with process layout and production tempo, and should roughly follow the following principles:

(1) The size of the storage area should meet the basic inventory requirements. The basic inventory is generally not less than 2 hours of consumption. The area of the storage area should be calculated based on the total number of parts, the size of the parts station and equipment, and the number of frames to ensure that the area is not less than the area required for 2 hours of inventory.

(2) The storage area should be close to the logistics door of the workshop and the logistics channel of the factory area.

(3) In consideration of logistics efficiency and space saving, the width of logistics channels between welding lines is generally about 3m.

(4) Logistics channels must be reserved for all workstations that need to be loaded to ensure distribution space.

(5) The logistics direction cannot be opposite to the overall flow direction of the body.

Chery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement ProjectChery Kaifeng Plant 30JPH Capacity Improvement Project


Product Tags:

Spot welding biw fixture design engineer

      

MAG MIG biw fixture design engineer

      

Stud welding biw fixture design job

      
Quality Chery Kaifeng Plant 30JPH Capacity Improvement Project for sale

Chery Kaifeng Plant 30JPH Capacity Improvement Project Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Guangzhou Kinte Electric Industrial Co., LTD
*Subject:
*Message:
Characters Remaining: (0/3000)